Skip links

Marine Corps Air Station – Yuma, AZ

This project renovated and repaired the 1972 BEQ Building 913, a multi-story reinforced CMU facility with 90 sleeping rooms, by addressing deteriorated interior and exterior components, upgrading HVAC, electrical, and plumbing systems, and adding energy-efficient improvements including insulation, new finishes, roofing, windows, and doors.

Location: Yuma, Arizona

Project Details

BEQ Building 913 Renovation
Design-Build delivery model
American Design: Designer of Record

This project provides major repairs and renovations to BEQ Building 913. The building was constructed in 1972 and consists of 90 sleeping rooms grouped in suites with common service cores consisting of gang shower and toilet rooms, laundry rooms, housekeeping room, storage rooms, lounge/meeting rooms on all floors. BEQ 913 is a multi-story reinforced CMU building with reinforced concrete slab and floors and built up roof. Repair and renovation work includes interior and exterior work necessary to repair/replace damaged and deteriorating building components attributable to inadequate sustainment, abuse, and excessive age. The project also provides a number of energy saving upgrades. Work included the addition of exterior wall and roof insulation, replacement of wall/floor/ceiling finishes, exterior painting, roof replacement, door and window replacements and extensive work to HVAC, electrical and plumbing system components.

Project Cost

$2.5 to $4 Million

Square Feet

30,000

Project Industry

Mixed Use

Completion Date

N/A